Plantaže

SITUATION BEFORE THE CONTRACT AND CLIENT REQUIREMENTS

Plantaže AD, the largest winery in the region and one of the most
famous, has very high energy costs.

It uses an old heavy oil steam boiler, incurring significant costs for
operation, maintenance,cleaning, as well as losses on steam pipelines.

The current system has no existing condensate return either.

GGE SOLUTION

GGE’s proposed solution was the installation of a new biomass steam
boiler, 2MW capacity, 3t/h, with a partially new steam line and an
entirely condensate return.

The new fuel proposed is biomass from vine cuts, which is a by-product
of the company’s main operation and has low moisture content and high
calorific value.

RESULTS

0 %
Annual cost savings
  • More reliable system, highly efficient and with drastically lowered CO2 emissions.

STATUS – COMPLETED

YEAR

2017